Recently, Mr. Phan Khac Long, Chairman and CEO of Phan Vu Investment JSC and Lu Trieu Duong - Vice Director of Construction Division, visited and worked with subsidiaries of regional corporations. Central, and field visits to the construction sites in the area such as Hoa Phat Steel Site, Da Phuoc - Da Nang Site, Ha Tinh Formosa Site.
During the visit, Mr. Phan Khac Long evaluated the site preparation work, the current construction work is very good, but still have to ensure the increase in construction productivity to meet the progress of the investor has. Out
General Director with the Commander of Hoa Phat Steel (Mr. Tung - right)
General Director working at Da Phuoc - Danang
General Director visited Ha Tinh Formosa
General Director visited Phan Vu Quang Binh factory