Project: Dong Hai Wind Power Plant
Location: Bac Lieu
Client: Bac Phuong Joint Stock Company
Scope of work: Supplying Pile D500, D800
Contract value: 44.000.000.000 VND
Scope of work: Supplying & Constructing Eurowall panel
Contract value: 27.000.000.000 VNĐ
Scope of work: Supplying and pressing spun pile D500
Contract value: 9.158.000 USD
Scope of work: Supplying and construction sheet pile wall SW400B, SW600B, SW740, SW840, SW940
Contract value: 142.028.000.000VND
Scope of work: Supplying and drilling spun pile by BASIC method D800
Contract value: 33.972.000.000VND
Scope of work: Supplying and drilling by BASICN methhod D600
Contract value: 89.216.000.000VND