Project: Aeon Mall Mean Chey
Location: Phnompenh Campuchia
Client: LIGHTNING VN COMPANY LIMITED
Scope of work: Supplying the concrete piles D600
Contract value: 21.400.000.000 VND
Scope of work: Supplying and Pre-boring (HyperMEGA method) the PHC D700
Contract value: 88.000.000.000 VND
Scope of work: Supplying and pressing the PHC D300A
Contract value: 14.000.000.000 VND
Scope of work: Supplying and pressing the PHC D500a, D600B
Contract value: 20.000.000.000 VND
Scope of work: Supplying and pre-boring the PHC D700, D800
Contract value: 65.000.000.000 VND
Scope of work: Supplying and constructing concrete panels EUROWALL
Contract value: 2.000.000.000 VND