Project: Dong Nai Waterfront City
Location: Dong Nai
Client: NAM LONG GROUP
Scope of work: Supplying and constructing D300, D350, D400
Contract value: 22.000.000.000 VND
Scope of work: Supplying and Pre-boring (HyperMEGA method) the PHC D700
Contract value: 88.000.000.000 VND
Scope of work: Supplying and pressing the PHC D300A
Contract value: 14.000.000.000 VND
Scope of work: Supplying and pressing the PHC D500a, D600B
Contract value: 20.000.000.000 VND
Scope of work: Supplying and pre-boring the PHC D700, D800
Contract value: 65.000.000.000 VND
Scope of work: Supplying and constructing concrete panels EUROWALL
Contract value: 2.000.000.000 VND