Project: Intercontinental Halong Bay
Location: Ha Long, Quang Ninh
Client: BIM Group
Scope of work: Supplying and constructing the spun pile of D300, D350
Contract value: 23.000.000.000 VND
Scope of work: Supplying and drilling spun pile by BASIC method D800
Contract value: 67.776.000.000VND
Scope of work: Supplying and drilling spun pile by BASIC method D600
Contract value: 1.642.000 USD
Scope of work: Supplying spun pile and square pile
Contract value: 50.000.000 VND